Scarabeo 8 – BOP Winter enclosure upgrade

One of the first offshore projects of AlpAccess was the erection of a steel structure wall at the B.O.P. area on Saipem’s Scarabeo 8 Semisub rig

The wall was part of the winter enclosure upgrades, to help the rig withstand the harsh winter conditions of the North Sea,

AlpAccess rope access team performed steel structure erection, welding, bolting, rigging and painting, but also other rope access services at the request of the rig crew.

Clients


allimep-est

Services Rendered


Related Projects


Black sea offshore rigs potable water tanks lining Black Sea, offshore, Romanian sector
Salrom S.A. – Brittle salt blocks removal Slanic salt mine, PH, Romania

All our services


Scaffolding erection , system, fixed and mobile
Uncoventional reapirs and composite repairs
Maintenance and repairs, welding services
Thermal Insulation, hot, cold, industrial insulation
Rigging & Lifting of heavy equipment
Passive fire protection with intumescent coatings
Corrosion protection, blasting and painting
Industrial rope access services
Wind turbine services – onshore and offshore
Fall protection and lifeline systems