Black sea offshore rigs potable water tanks lining

We were chosen to re-line the potable and salt water tanks on all the OMV-Petrom’s production platforms in the Romanian sector of the Black Sea.

The tanks were blasted up to Sa 3 according to ISO 8501-1. An epoxy primer was applied and all the pits were filled with a suitable epoxy filler.  A 1 – 2 mm thick Polyurea membrane was applied.

The challenge consisted in the application in winter time offshore. Our team carried out the application without any defects and in due time.

Clients


logo petrom

Services Rendered


Related Projects


Subsea components blasting & painting Faur factory, Bucharest, Romania
Scarabeo 8 – BOP Winter enclosure upgrade North Sea, offshore, Norwegian Sector

All our services


Scaffolding erection , system, fixed and mobile
Uncoventional reapirs and composite repairs
Maintenance and repairs, welding services
Thermal Insulation, hot, cold, industrial insulation
Rigging & Lifting of heavy equipment
Passive fire protection with intumescent coatings
Corrosion protection, blasting and painting
Industrial rope access services
Wind turbine services – onshore and offshore
Fall protection and lifeline systems